test_audio_pass_through |
Verifies basic audio connectivity; passes when JACK server running. Does not test any looper‑specific behavior beyond pass‑through. |
test_looper_looping |
Exercises the state machine (IDLE→RECORD→LOOPING) using MIDI note 1. Detects repeated audio bursts. Works with current implementation but uses note 1 instead of the required control key (64). The 0.1‑second beep and 4‑second wait may be sensitive to CPU load. |
test_multiple_channels |
Expects dynamic channel creation via note 60 (add channel). Current looper does not handle this command, causing immediate failure. This test is effectively a placeholder for future implementation. |
| Coverage gaps |
No tests for: control key note 64, remove channel, binding, per‑channel loops, state transitions other than note 1, robust handling of JACK server disconnection. |
| Thread safety |
The test assumes sequential execution and uses long sleeps for synchronization. The real‑time thread is managed by JACK; the test process runs asynchronously, which can lead to timing‑sensitive failures on heavily loaded systems. |
| Resource handling |
Tests properly kill child process and close JACK clients. No memory leaks. |
| Overall verdict |
The test suite provides a minimal smoke‑check but does not validate the full specification. It must be updated to use the correct control key (64), cover dynamic channel commands (add/remove/bind), and handle non‑existent features before it can be considered a trustworthy integration test. |